2017 Tarragon.ETAP. Adequacy, revision of horizontal anti water 30000L PN16 Bar. Certification and inspection level B.

2018 Tarragona. Transfer pumping station. Adaptation, revision and change of bladder for two horizontal anti water 5000L PN 25 Bar. Certification and inspection level C, hydraulic retest.

2019 Málaga. Hospital.Installation and start-up of vertical anti water 2500L PN 16 Bar.

2018 Cartagena.ETAP.Adaptation and revision of vertical anti water 25000L PN 25 Bar. Certification and inspection level B.

2018 Nervacero.Industrial plant. 37 inspections that include LEVEL A, B, C for accumulators and oleohydraulic tanks from 50 to 2000L with pressures between 5 to 330 Bars. Bladder change and corresponding safety elements.

2019 Melilla. Desalination plant. 12000L -16 Bar horizontal anti water, level C certification and inspection. Removal, change of bladder, installation and commissioning.

2019 Castuera Badajoz. Pumping station. Adaptation, revision and change of bladder for two 5000L PN 25 Bar horizontal anti water, certification and inspection level C - hydraulic test.

2017 Consorci Tarragona. Pumping. Bladder change and 3000L PN 20 Bar horizontal anti water start-up.

2020 Tenerife Norte. Desalination plant. Vertical anti water 25000L 25 Bar without bladder, certification and internal inspection, hydraulic test LEVEL C, inflation and start-up.

2019 Pontevedra. El Rosal.Pumping: inflated and anti water start-up.

2020 Zaragoza
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels . Level C certification and inspection, hydraulic retest and installation legalization project.

2020 Ibiza.
CODEISA.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2020 Balears.
ALEARES ETAP.
Adequacy, review, internal painting and change of bladder. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Ibiza. Desalination plant.
Horizontal anti water hammer IBAIONDO 10000L -16 bar with bladder, certification and inspection, LEVEL C, hydraulic test, inflation and start-up, internal recovery, rust removal, pickling and internal painting with special food certification paint.

2021 Alicante. Sewage pumping estation.
Anti water hammer for sewage without bladder 55.000L PN 10 Bar, certification and inspection level C, internal recovery, rust removal, pickling and internal painting with special food certification paint.

2021 Lleida.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Almería.
Desalination plant.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Madrid.
Canal Isabel II.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Riotinto.
EDAR.
Adaptation, review and installation of wastewater pumping systems in Riotinto mines. Horizontal anti water hammer vessels certification and inspection level C, hydraulic retest and installation legalization project.

2021 Barcelona.
UTE Sagrera.
Assembly of 2 anti water hammer vessels without bladder and compressor, electrical panels and pneumatic installation. Level C certification and inspection, hydraulic retest and installation legalization project.

2022 Barcelona.
CELSA.
Adaptation, revision and inflation of TRANSFER system of N2 with 70 bottles and booster at 215 Bars.

2022 Lleida.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2017 Badajoz Irrigation Community. Adequacy, revision and change of bladder for horizontal anti water 8000L PN 25 Bar. Certification and inspection level C, hydraulic retest and project. legalization facility.

2018-19 Torrevieja. Desalination plant. Adequacy, revision and change of the anti water bladder 80000L PN 15 Bar at the Acciona Torrevieja plant. The largest desalination plant in Europe. Level B certification and inspection.

2018 Skikda Argelia.Adaptation, revision and change of bladder for horizontal anti water 10000L PN 10 Bar for reverse osmosis application. Internal inspection and adjustments to the super duplex connections.

2019 Lleida.Irrigation pumping. Removal, change of bladder, installation and start-up anti water horizontal 35000L PN 16 Bar. Certification and inspection level B, change of security elements.

2019 Tarragona. Consorci de Tarragona, Soriguer. Pumping. Withdrawal, change of bladder, inspection level C and start-up of 500L vertical anti water, PN 25 Bar. Training course.

2019 Mexico AMHSA.Pumping of the aceria.Anti water vertical cooling system of 12000L -8 Bar. Removal, change of bladder, installation and start-up.

2017 Torroella de Montgrí. Sorea.Fire station. Adaptation, revision and change of bladder for horizontal anti water 9000L PN 16 Bar.

2019 Carboneras. Desalination plant. 35000L 25 Bar horizontal anti water, certification and internal inspection, removal, change of bladder, installation and commissioning.

2020 CLH Aeropuerto Tenerife.Pulsation damper: overhaul and change of the bladder of the damper for pumping fuel planes.

2020 Planta Industrial Tubos Reunidos. 6 inspections that include LEVEL A, B, C for accumulators and oleohydraulic tanks from 50 to 100L 250-330 Bars. Bladder change and corresponding safety elements.

2020 Tenerife.
CLH Airport.
Adaptation, revision and change of bladder for vertical anti water hammer vessels for GASOIL. Level C certification and inspection, hydraulic retest and installation legalization project.

2020 Ciudad Real.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Sagunto. ETAP.
CHARLATTE's 4 horizontal-vertical anti water hammer vessels with bladder, certification and inspection, LEVEL C, hydraulic test, inflation and start-up, dismantling joint installation and isolation valve.

2021 Barcelona. Sagrera Station.
Rainwater pumping. Two antiwater hammer sewage without bladder 8.000L PN 10 Bar, with compressor, electrical panel, reel installation and isolation valve.

2021 Jaca. ETAP.
Bladder change and 1.000L vertical anti water hammer start-up -PN 25 Bar

2021 Zaragoza.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels.

2021 Almería.
Desalination plant.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Sevilla.
AIRBUS CLH Airport.
Adaptation, revision and change of bladder for vertical anti water hammer vessels for GASOIL. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Tarragona.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels.

2022 Huelva.
Irrigation community.
Adaptation, review for vertical anti water hammer vessels without bladder and compressor. Level C certification and inspection, hydraulic retest and installation legalization project.

2022 Ibiza.
CODEISA.
Adaptation, revision and change of bladder for vertical anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2022 Barcelona.
OEM.
Adaptation, review and inflation of the 70 pressure accumulator system. A,B,C inspections.

2017-18-19 Lleida.Pumping station. Adaptation and revision of 4 horizontal anti water of 35000L PN 25 Bar. Bladder change and safety elements.

2017 Badajoz. Irrigation community. Adequacy and revision of 7 vertical anti water from 2400 to 3000L PN 10 Bar. Level A certification and inspection.

2017-19 Muskiz.Petronor Refinery. Installation and start-up of the vertical accumulator INOX 250L - PN 5 Bar supporting the Randon tank for the compressor's lubrication emergency system.

2019 Aguilas. Desalination plant. 25000L PN 25 Bar. Level C certification and inspection, removal, change of bladder, installation and start-up of vertical anti water, great technical difficulty, test in open pumping.

2018 Soria. ETAP.Removal, change, installation and commissioning of 4000L PN 25 Bar horizontal anti water, legalization project. Manufacture of special coupling with great technical difficulty since coupling is connected in suspension to pipe. Change of control elements.

2019 Aguilas. Desalination plant. 35000L -25 Bar horizontal anti water, certification and internal inspection, removal, change of bladder, installation and commissioning.

2017 Portugal. Adaptation of 2 stainless steel anti-rams without bladder for gas turbine cooling circuit. Manufacture of 2 anti water 500L PN 12 inox, placement of external measurement system and electrical panel.

2017 Escombreras. Desalination plant. Revision, recharge and start-up anti water vertical. 25000L PN 25 Bar.

2020 Almería. Consentino. Review, assembly and installation of liquid marble pump anti-pulsation accumulators.

2020 Nervacero. Industrial plant.
22 inspections that include LEVEL A, B, C for accumulators and oleohydraulic tanks from 50 to 2000L with pressures between 5 to 330 Bars. Bladder change and corresponding safety elements.

2020 LLeida.
Albajes Dam.
Anti water hammer vessels installation without bladder, electrical panels and various emergency systems.

2020 Extremadura
ETAP
Adaptation, revision and change of bladder for vertical anti water hammer vessels.

2021 Lleida. Pumping station.
Horizontal anti water hammer vessel 35000L PN 16 Bar CHARLATTE with bladder, certification and inspection, LEVEL C hydraulic test, inflation and start-up, dismantling joint installation and isolation valve.

2021 Ciudad Real. ETAP.
Bladder change and horizonta anti water hammer star-up 6.000L -PN 16 Bar, internal cleaning.

2021 Lleida.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Valencia.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Alicante.
ACCIONA desalination plant.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels.

2021 Lleida.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2021 Alicante.
ETAP.
Adaptation, review and internal painting of anti water hammer vessels of 80,000L. Level C certification and inspection, hydraulic retest and installation legalization project.

2022 Lleida.
Irrigation Community.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.

2022 Vic
ETAP.
Adaptation, revision and change of bladder for horizontal anti water hammer vessels. Level C certification and inspection, hydraulic retest and installation legalization project.